A new facade and modern steel structure are already changing the look - while the interior enters the final modernization stages

The future of travel from Osijek is taking its final shape! Take a look at how our passenger terminal transformation is progressing - from a brand-new facade to state-of-the-art installations, Osijek Airport is preparing for a new era.
Forget the old look - Osijek Airport is entering its most exciting phase yet. If you’ve passed by recently, you’ve likely noticed the terminal building is almost unrecognizable. The new facade and modern steel structure are no longer just drawings on paper - they already dominate the site and signal the standards our passengers deserve.
What’s happening behind the scenes?
While the exterior is turning heads, the terminal interior is buzzing with activity. Our goal is not a cosmetic refresh, but a full modernization:
-
99% of installations completed: plumbing, drainage, ventilation and electrical systems are practically finished - the building’s “heart” is ready.
-
Roof works in focus: we’re currently insulating roof sections and preparing for new skylights that will bring more natural light into the terminal.
-
A second level is taking shape: stairways are in place and the central upper section has been built, with finishing walls already underway.
Coming next: the interior “face”
The biggest visual change is still ahead. Tiling works will start soon, giving the interior its final, world-class finish. Everything is on schedule - and every day brings us closer to welcoming you into one of the most modern terminals in the region.
Watch the video and see the progress for yourself:



